The Project
This grade 2 listed building required exterior refurbishment including roof construction. The budget was £47,000 to be completed over a 5 week period.
This grade 2 listed building required exterior refurbishment including roof construction. The budget was £47,000 to be completed over a 5 week period.
We refurbished all sash windows and limestone on the exterior, including painting all frames. The exterior metal work required repairs and also repainting to it’s original state.